Location: Edmonton, AB Canada
Project Completed: 2018
This new arch bridge replaces the current bridge, crossing the North Saskatchewan River. This signature bridge is the first of its kind in Edmonton, with two 56 m tall arches spanning the river just east of the current bridge. The new bridge arches are supported by thrust blocks on both river banks, eliminating permanent in-river piers.
Provided all geometry control / dimensional confirmation checks and related post-processing of measurement data.
Reviewed all fabrication sub-contractor’s ‘means and method’ statements.
Conducted risk analysis of the current trial assembly methodology.
Assisted sub-contractor with trial assembly methodology refinements – to improve final quality and decrease cycle times.
Reviewed erection sub-contractor’s ‘means and method’ statements.