Location: New Westminster, Surrey, BC Canada
Project Completed: 1990
Total Length: 616 m (2020 ft.)
Main Span: 340 m (1115 ft.)
Tower Height: 117 m (384 ft.)
This cable-stayed bridge carries two tracks of light rapid transit across the Fraser River. It is currently the world’s longest cable-supported transit-only bridge.
Provided independent consultancy and contract term employee, in the role of project surveyor for the supervision engineer.
Provided independent geometry control confirmation.
Provided geometry control supervision of sub-contracted precast concrete deck segment casting.