Shaikh Zayed Bridge

Photo Credit © Mohannad Khatib

Location: Abu Dhabi, U.A.E
Project Completed: 2011

Total Length: 842 m (2762 ft.)

Main Span: 140 m (459 ft.)

DESCRIPTION

A twin deck bridge comprising pre-stressed concrete box girders, supported by bearings on concrete piers and by hangers on a pair of 3D steel arches. The steel arches are connected to the concrete piers to transfer their loads into the foundations.

SERVICES PROVIDED / DUTIES AND RESPONSIBILITIES

  • Provided independent consultancy, and a chief surveyor, to provide methodology, training and supervision for Archirodon’s survey teams.

  • Supervision of temporary works steel fabrication in Abu Dhabi.