Sheikh_Zayed_Bridge_-_Abu_Dhabi,_UAE
Photo Credit © Mohannad Khatib
Location: Abu Dhabi, U.A.E.
Project Completed: 2010

Total Length: 842 m (2762 ft.)
Main Span: 140 m (459 ft.)

Description

A twin deck bridge comprising pre-stressed concrete box girders, supported by bearings on concrete piers and by hangers on a pair of 3D steel arches. The steel arches are connected to the concrete piers to transfer their loads into the foundations.

Services Provided / Duties and Responsibilities

  • Provided independent consultancy, and a chief surveyor, to provide methodology, training and supervision for Archirodon’s survey teams.
  • Supervision of temporary works steel fabrication in Abu Dhabi.